
“Cortec team Ivana Liposcak (from left), Boris Miksic, Ivana Radic and Ivan Rogan, Executive Vice President of Cortecros, visiting the site of the new Peljesac Bridge, one of the largest current construction projects in Europe. The design life of the bridge is 100 years made possible by application of MCI-2018. The nearby shellfish farms, in the ecologically sensitive Adriatic Sea, have influenced bridge’s designer to specify Cortec MCI-2018 as the most desirable corrosion protection solution”